Manual recap: Low-speed control and a wind-aware approach, with lines prepared before pickup.
Overview
Mooring buoy pickup should be planned early with a safe approach and correct line handling.
Key points
- Approach with the wind from ahead where possible for better control (Manual p.81).
- Prepare lines before approach and secure with a bowline and springs (Manual p.38).
- Maintain low speed and clear communication with crew.
Manual reference: pages 38, 81.